Development, design, manufacture, sales, service of gas and vapour monitoring, equipment and systems.
Design, development and manufacturing of guided transport automation, switched mode power supply and battery charger systems and devices.
Design, development, manufacturing and maintenance of control technique, remote control and dispatching station applications.
References
Our company has been supplier of Hungarian State Railways (MÁV Zrt) since its establishment.
Train Control System (EVM)
Our company has been supplier of Stadler Bussnang AG and several Romanian companies since 2006 (SNTFM CFR MARFÄ S.A., S.C. Rolling Stock Company S.A.)
The company has been supplier of Bombardier Transportation GmbH., Siemens AG., ÖBB and the Hungarian Bombardier MÁV Kft. since 1998
Design
2010 Iraq-Syria border railway station Feasibilty study, preliminary designs and final detailed tender designs. Basic surveys and processing of data necessary to tender design
2008-2010 Kirkuk- Sulaimaniya new railway line Detailed feasibility study and final tender design.
Basic surveys and processing of data necessary to tender design
2008-2009 Hamman- Alil Saboniya railway project Preliminary design of reconstruction of existing Diesel operated single-track railway line.
Study of electrification possibilities
Project management, construction 2011
Cable substructure works at Eperjeske shunting station, job at Záhony Phase 2.
Half and light barrier complementation on Hegyeshalom-OH railway line, at level crossing AS 1904 with bicycle route.
Electric points heating installations at stations Ják-Balogunyom, Egyházasrádóc, Körmend, Csákánydoroszló, Alsórönök, and Szentgotthárd on GySEV railway line
Electric points heating installations at stations Martonvásár, Gárdony and Dinnyés
2010
Installation of 33 pcs of UTB-M1 type electronic level crossing equipment on section Sopron-Szombathely-Szentgotthárd of GyESV railway line.
Installation of cable substructure and cable laying in length of 115 000 m on section Sopron-Szombathely-Szentgotthárd of GyESV railway line
2009
Changing of 5600 m line cable in the region of Farád, Szárföld on GySEV (Austrian-Hungarian) line
Construction of electric point heating at stations Pilis and Albertirsa.
Reconstruction and complementation of station interlocking equipment in Bükkösd
Point machine installation and joined interlocking equipment works in connection with turnout change at railway stations Celldömölk and Dombóvár
Reconstruction and transformation of level crossing equipments AS 70, AS 137 and AS 269 on Győr-Sopron line section of GySEV railways
2008
Increasing of railway level crossing safety all over the country in year 2008
Demolition and relocation of railway establishments at Budapest Western Railway station (Nyugati) for ensuring the territory of the construction of Government quarter, relocation of service and operating public utilities
Supply of complete interlocking power supply system for river port Gönyű
Points heating construction at Kőbánya-Kispest, Pestlőrinc and Szemeretelep
Points heating construction at Győr railway station
2007
Increasing of railway level crossing safety all over the country in year 2007
Points heating construction in Monor
Installation of passenger information system at stations Érd-alsó, Érd-felső, Érdliget and Barosstelep
Electric points heating installation at Budapest Transport Company (BKV Zrt) on East-West Metro line at Fehér út vehicle yard
Automatic fire-extinguishing system installation in storehouse of GySEV (Austrian- Hungarian Railway Line)
2006
Increasing of railway level crossing safety all over the country in year 2006.
Level crossing installations Harkány Sr1 and AS 483
Design, production and installation of Light and Light+Half-barriers protected by exclusive rights in place of 5 pcs of mechanic barriers, in the purpose of staff reduction and increased safety of level crossing ( Kistótfalu, AS 183, Vokány, AS 202, Villánykövesd, AS 285, Nagynyárád, AS 111, Nógrád, AS 239 )
Level crossing installation in Siklós, Sr2
Level crossing installation in Nemeske AS 460
Construction of interlocking equipment in Logistics and Service Centre in Sopron
Installation of electric points heating in Pécs region in 20 groups of simple turnouts
Points heating construction between Városföld and Kiskunfélegyháza
2005
Design and construction of 5 new energy supply column transformers at stations
Nagycenk, Lövő, Bük and Acsád and electric points heating and remote supervision systems in 19 turnouts.
Electric points heating construction in 23 groups of simple turnouts (5 stations) in Pécs region
Design, production and installation of Light and Light+Half-barriers, protected by exclusive rights, in place of 6 pcs of mechanic barriers, in the purpose of improving effectiveness by staff reduction and increasing safety of level crossings
2004
Supply and installation of half-barriers, new barriers, Red optics level crossings in the territory of the country in 35 locations for increasing of railway level crossing safety .
Points heating construction in Nyársapát, Nagykőrös and Katonatelep
Points heating constructions in Vecsés and Üllő
2003
Production, installation and putting into operation of 5 pcs MAS-01/7 signal protected level crossings with light-barriers on railway line Rétszilas – Szekszárd
Half-barrier complementation to the existing light-barriers on Budapest – Szentendre HÉV (suburban) line in level crossings in section 137+33 m with road crossing of road No. 1108, and on Budapest – Szentendre HÉV line in section 169+45 m with road crossing of road No.1112 in road section 2+854 km (Pomáz)
Substructure works in connection with interlocking reconstruction of outdoor interlocking equipment of Dunaharaszti
Complementation of operating light barriers with half-barriers in 23 places of the country in level crossings
Shunting protection equipment installation of railway loading place on industrial track of Füzesgyarmat TOE
2002
Points heating installation at Hegyeshalom station
Electric points heating at Rákos station
Protection equipment against counter directional traffic between stations Zalalövő – Körmend
Complete reconstruction or repair of defected points heatings on tram lines of Budapest Transport Company (BKV Zrt).
Wiring of frames of 5 block section cabinets between stations Zamárdi-felső – Balatonszemes in connection with forced reversal of running direction, wiring of the frames of stations, supervision of their contact protection.
Production, installation and putting into operation of MAS-01/7 light signal protected
automatic level crossing control equipment with light barriers, No. AS 58 and AS 64, on railway line Pécsbánya classification yard – Villány
2001
Design, construction and transloading during operation of telecom and interlocking power supply of station Örsvezér square, in contract named Modification Works of Interlocking Equipment, necessary for introduction of „Signalling Instructions No. F1 of HÉV” (suburban railways)
Interlocking rehabilitation of line Rákos – Újszász
Construction of electric points heating of turnouts on territory of Pécs Regional Directorate of MÁV Rt (stations Rétszilas, Balatonszentgyörgy, Balatonboglár, Godisa, Bicsérd)
1998
Design production and putting into operation of signal protected level crossing equipment, interlocked with electronic counter directional traffic equipment and block equipment , between stations Tolna-Mőzs and Nagydorog